Memory Lane......

Sunday, January 31, 2010

54 more days to go......

went to check on the date with dad, mum & adrian for our move in today, 54 more days to be exact..... brought adrian to P@D for his "mission" which i will not disclose here =P, he left after that to meet his dad, my uncle..... after P@D, mum suggested to go up Jurong Hill Top to have a walk, it had been quite some time since i was there...... after which was dinner with 2nd bro, sil & prince zllen.......


us @ 50th skybridge.....

everybody smiles =)

us @ Jurong Hill Top.....

there was only us up there.....

@ 2nd bro's house.....

dinner time......

prince zllen reading.....

he is fascinated with cars......
his multi-actions =)
soup & appetizers......

our dishes for the day.....

last but not least.... desserts

Colors ......

our painting is finally up, though it is only the 1st coat of paint & some of it remain to be finished(final touch up towards the end), we were still excited about the colors we chose.... went down after our lunch & after viewing, rach & i were satisfied & happy with the choices we made..... can't wait for our kitchen cabinets to be up, stay tuned for the colors we chose =)


harmonious purple for our living room & feature wall.....

our walkway.....

dining light not installed yet.....

in our walk in wardrobe... mirror not up yet....

the crystal light we bought ...... scarlet is the color we chose

in night mode.....

our MBR's feature wall with cove lights effect (black & white)
us in our future baby's room......
2 shades of blue with stripes deco.....
can u spot my Clipsal C-Metro switch.....

the light we bought =)
kompan playground in P@D.....
many of this pavillion available for the tired legs.....
follow the rules..... =p
access to the 26th storey skybridge.....
RC in the making on the 26th skybridge....

working out.... =)

Saturday, January 30, 2010

Clipsal C-Metro Switches....

rach & i juz came back from P@D after our meeting with denise, went to look at our painting, lights & switches installation...... we loved our newly install Clipsal C-Metro switches with LED indicator...... check out the below pics to find out what i mean =)

when it is at "OFF" position......
the LED goes off when it is at "ON" position......
confusing rite =p
our dimmer switch on the left......
our feature wall color =), we love it......

counting down ...... ..... .... ... .. .

Wednesday, January 27, 2010

Singapore Airshow 2010.....

the bi-annual airshow is here again, received my trade pass today but most likely will give it a miss as i will be working & on IS training on the trade days.... but will still be able to view the aerial display from tower, a pity that Black Knights will not be participating in this year event.....


my trade pass as a souvenir.....

a few pics to share on our renovation progress......


pinnacle @ night.....

downlights position marked.....

counter base made good....

we love our mosaic & waiting to install our rain shower =)

shower screen done.....

rach's dream come true, super duper big mirror
awaits her with glittering mosaic frame....

counting down...... ...... .... ... .. .

Monday, January 25, 2010

Busy.....

these few days have been really busy, rach & i been driving around singapore to get the stuff needed for our house, travel to the east getting our wall covering, north for our painting, south to get our Schneider/ Clipsal switches.... though tiring but we were happy with all the shopping, this week should be able to see more progress on our reno, will upload the pics soon, till then =)

Monday, January 18, 2010

Weekend Updates......

mother & valerie came over during the weekend, picked them up on fri afternoon before meeting up with rach for dinner & bringing them to P@D..... saturday was spent having lunch with them together with mummy & auntie hong before i set off to work, while they went for their shopping spree in orchard..... mother went back on sunday morn while valerie stayed till today before her flight this evening.....

some updates on the renovation over the weekends......

the structure of our feature wall in the living room being built....

here it is.....
the base for our kitchen island top......
the sealed up door along the walkway.....
view inside the room.....
side view of our MBR feature wall.....
fabricating the structure.....

false ceiling for cove light effect is up.....
2 days later, feature wall done up......
can u notice the difference in depth..... =)

cant wait for the finished product.....
laying the tiles....
our MBR feature wall is up too.....
getting nearer.....
our dining area lighting......
all our downlights, cove lights, dining, wiw lights are here.....

painting will be done over the next few days, followed by our foyer area..... were happy with the progress so far & we are still very much on schedule for our proposed move in date =)